Camera systems for a construction handover that explains the weekend gaps

By Gate & Shift Editorial Desk · Planned week of 2026-12-07 · Documentation reviewed 2026-11-15

Monday's owner meeting opens with one question: “Was anyone at the compound on Sunday?” An empty incident list does not settle it. There may have been no activity — or there may have been a gap in observation, and the handover needs to keep those two possibilities apart.

The priority here is a useful weekend record, not a claim that cameras make a site safe. A fixed installation, a temporary unpowered gate and a building being handed to a new facilities team can each call for different equipment.

At a glance

OptionHandover strengthPrice evidenceImportant limit
SightlineDetection hours and gaps at the start of every PDF A06Tentative base plus detecting-camera pricing A08Reports are not safety clearances A13
LVT EssentialsSolar mobile unit, visible deterrent, recorded footage V14$1,000/month advertised, annual prepayment and eligibility restrictions V15Essentials omits agentic AI
CoramLocal recording and multi-site dashboard V03Quote by camera count and recorder V04Separate LANs require Points
LumanaCore replacement recorder and VMS+ access V06Annual feed/retention/term quote V07A migration, rather than a report-only add-on

Sightline: the pick for a coverage-first weekend PDF

The Icarian product marketed as Sightline links to an application labeled Argus A01. Read the front of its PDF first, because that is the observation record: each camera's detection hours, the gaps and the explanations for them. Icarian says the report must retain this section A06. It supports a handover habit worth building: read the coverage page before discussing incidents P04. The owner gets a place to see when the camera was actually under detection, instead of taking a quiet list as proof of an uneventful weekend.

Staff can acknowledge incidents, leave notes and close them; a continuing event and any return inside ten minutes stay in one incident A05. So an incident count is not a visitor count. Prices remain tentative: Starter at $49 plus $129 per detecting camera monthly, Pro at $199 plus $149, and a 4K feed counts as three A08. Ask which plan supports the report workflow you intend. Icarian explicitly does not represent its reports as inspections or safety clearances A13.

LVT Essentials: the better fit when the gate has no wired power

LVT's Essentials package includes a solar-powered mobile unit, panoramic Axis camera, blue strobes, live viewing and 14 days of recording, and its August 26, 2026 announcement says the package omits LVT's agentic AI features V14. Where a temporary compound first needs a visible camera in position, a trailer can solve that problem. An analytics subscription has nothing to attach to when there is no installed feed yet.

The advertised US price is $1,000 per month, with annual prepayment, prequalified accounts and availability limited to refurbished or retrofitted units V15. At that advertised rate, twelve months implies $12,000 paid annually — this is not a month-to-month offer. Confirm placement, connectivity, coverage and availability in the proposal, and keep Essentials off any AI-feature comparison under capabilities its announcement specifically excludes.

Coram: choose it when the handover includes local footage

Coram Point records on site and provides browser and mobile access, with a shared dashboard across sites. Each site on a separate LAN needs at least one Point V03. For a construction firm moving toward a permanent installed-camera setup, that gives the local recorder a clear job. The handover should say where the equipment sits and who controls access to it.

Coram's price follows camera count and recorder choice V04. Ask for a retention commitment at the actual camera settings, and confirm what changes when the temporary site office comes out. Treat it as a transition exercise: draw the temporary and permanent LANs separately. A recorder's published maximum capacity is not a signed promise for the configuration arriving on your job.

Lumana: for a handover that is also a system migration

Lumana Core replaces a DVR or NVR, stores and processes footage, and exposes licensed feeds through VMS+. The vendor describes standard-streaming IP camera support and no stated user ceiling V06. That fits a handover where the old contractor's recorder is leaving and several facilities staff need access to whatever replaces it. Make the access transfer part of acceptance, with named account owners.

The annual license structure depends on feed count, retention and term; a quote typically includes Core hardware and VMS+, with features included as standard, and the public page gives no fixed dollar amount V07. Request a priced transition plan and identify who owns renewal. If all you need is a coverage explanation in a weekend PDF, a full recorder migration may be a bigger purchase than the task warrants.

A sample handover calculation

Suppose two cameras were each scheduled for twelve hours — 24 scheduled camera-hours in total. If one was under detection for twelve hours and the other for nine, the recorded monitored total is 21 hours, and coverage is 21 ÷ 24 = 87.5%. This is a hypothetical worksheet calculation, not a vendor result.

Write the three missing hours beside the incident list. “No observed entry during monitored time” says more than “nothing happened.” Keep the coverage record, incidents, permitted clips and operator notes together; the shift handover sheet offers a repeatable structure.

FAQ

Can the PDF certify that the site was safe?

No. Icarian says its reports are not inspections or safety clearances A13. A video record also has a defined view and observation window.

Is Essentials an AI-equivalent alternative to the others?

No. Its documented entry-level package omits agentic AI V14. It earns its place here through temporary deployment and recording.

What should we ask to see in a demonstration?

Ask for an example with a known interruption as well as an event. A system that shows incidents owes you a separate answer for the hours it could not observe.